BATTERY ENERGY STORAGE SYSTEMS DEVELOPMENT STAGES
Feasibility study for the Battery Energy Storage System (BESS)
Selection of an appropriate location.
Analysis of the financial viability of the project.
Topographic mapping
Drawing up integrated topographical plans and siting of the equipment.
Environmental licensing
Requests for opinions are made by the competent services.
Application for grid connection
Electricity interconnection of the station with the grid or new substation.
Construction
Installation of the basic Electromechanical Equipment and electrical work for the connection.