NANKO Group meets the modern requirements in the field of green energy and undertakes the development of Battery Energy Storage Systems (BESS), starting from the feasibility assessment, all the way to the necessary connection work.

Energy storage systems can provide energy time shift functions, storing in surplus periods and releasing in deficit periods, thus contributing to increased energy efficiency.

BATTERY ENERGY STORAGE SYSTEMS DEVELOPMENT STAGES

Feasibility study for the Battery Energy Storage System (BESS)
Feasibility study for the Battery Energy Storage System (BESS)

  Selection of an appropriate location.
  Analysis of the financial viability of the project.

Topographic mapping
Topographic mapping

  Drawing up integrated topographical plans and siting of the equipment.

Environmental licensing
Environmental licensing

  Requests for opinions are made by the competent services.

Application for grid connection
Application for grid connection

  Electricity interconnection of the station with the grid or new substation.

Construction
Construction

  Installation of the basic Electromechanical Equipment and electrical work for the connection.