SERVICES

WIND PARKS

Image

The NANKO group is active in the field of Wind Energy, undertaking the design, licensing, installation and operation of wind parks. 

WIND PARK DEVELOPMENT STAGES:

Selection of an appropriate location
Selection of an appropriate location
Additional necessary studies and works
Additional necessary studies and works

  Risk analysis and feasibility study.
  Environmental Impact Study.
  Road Construction Studies.
  Studies of electrical interconnection of the station with the grid or new substation, as well as electrical studies of the internal medium voltage cabling of the wind farm.

Project operation
Project operation

  Operation monitoring and analysis of the energy production.

Determination of the wind potential of the area
Determination of the wind potential of the area

  It is carried out with the installation of meteorological masts that record wind data for at least one year. This data is then processed to estimate the wind potential for the installation of the Wind Park in each area.

Wind Farm Construction Stage
Wind Farm Construction Stage

  Civil Engineering Project Studies.
  Geotechnical Studies.
  Electrical Studies and Other Studies required for the construction of the project.
  Electrical interconnection with the grid and internal medium voltage cabling of the wind farm.
  Installation and commissioning.

Selection of an appropriate location
Selection of an appropriate location
Determination of the wind potential of the area
Determination of the wind potential of the area

  It is carried out with the installation of meteorological masts that record wind data for at least one year. This data is then processed to estimate the wind potential for the installation of the Wind Park in each area.

Additional necessary studies and works
Additional necessary studies and works

  Risk analysis and feasibility study.
  Environmental Impact Study.
  Road Construction Studies.
  Studies of electrical interconnection of the station with the grid or new substation, as well as electrical studies of the internal medium voltage cabling of the wind farm.

Wind Farm Construction Stage
Wind Farm Construction Stage

  Civil Engineering Project Studies.
  Geotechnical Studies.
  Electrical Studies and Other Studies required for the construction of the project.
  Electrical interconnection with the grid and internal medium voltage cabling of the wind farm.
  Installation and commissioning.

Project operation
Project operation

  Operation monitoring and analysis of the energy production.

Image

Our Services

SMALL HYDROELECTRIC POWER PLANTS

We undertake the development of Small Hydroelectric Power Plants (SHPP), which contribute to local development in an environmentally friendly way.

WIND PARKS

Integrated licensing, installation and operation services of wind parks, which contribute to climate change mitigation.

PHOTOVOLTAIC PARKS

Design, licensing, construction and operation of Photovoltaic (PP) Parks, with the signature of our company.